Skip to main content

Graduate Education Institute · Engineering Management · Master

ECTS: 7.5 T+P+L: 3+0+0 Departmental Elective
Coordinator: Prof. Dr. Ahmet Korhan BİNARK

Course Objective

First of all, awareness training practices (by showing examples) that can start from the very young ages of the individuals and continue until their advanced ages on the graduate students who take this course at I.Z.U. / or final research assignment(s) and / or graduate project(s) and related scholarships and / or competition programs of TÜBİTAK and similar organizations, which are supported by the University (İ.Z.Ü.) As a basis, students' project proposals related to the advantageous and / or disadvantageous aspects of their environment (near and / or far), especially the life they plan and dream to have in the near and / or distant future, and the critical factor(s) in these proposals are acceptable. It is capable of preparing sample project(s) demonstrating awareness of the error(s), plan B(s) and existing analogues of these project proposals. meat development. (NOTE: CONFIDENTIALITY GUARANTEE IS GIVEN BY THE ACADEMIC MEMBER IN THIS COURSE RELATING TO THE PROJECT SUBJECTS)

Course Content

In the content of this course in İ.Z.Ü., first of all, awareness training applications that can start from the very young ages of individuals and continue until their advanced ages are shown by showing examples through projects [ TÜBİTAK (Secondary School Students Research Projects- THIS IS MY WORK), (High School Students Research Projects), (Undergraduate Projects 2209 / A, 2209 / B and 2241), (Master's Projects) will be done. Relatively, the methods of benefiting from the LIBRARY (especially e-library) and TECHNOLOGY TRANSFER OFFICE (TTO) at the University will be explained. Subsequently, undergraduate research assignments will be made. / graduation projects; Master's / Doctoral Theses; Academic Publications; INVENTORS, PATENTS; KOSGEB / R&D CENTERS / DEVELOPMENT AGENCIES / TECHNOPARKS / TÜBİTAK TEYDEB, KAMAG PROJECTS / EUROPEAN UNION PROJECTS will be introduced and the effective utilization methods will be explained through examples. At the end of the course, students will be asked to prepare projects in accordance with the objectives of the course.

Core Area Distribution

(14) Teacher Training and Education Science%10 (21) Arts%10 (31) Social and Behavioural Science%40 (44) Physical Sciences%20 (52) Engineering and Engineering Trades%20

Teaching Methods

ExpressionQuestion-AnswerDiscussionGroup StudySelf studyProject Based Learning (Including Field Work)

Assessment & Evaluation

Project / DesignTesting (Essay / Tests: True-Falls, multiple-choice, short answer, matching)

ECTS / Workload

ActivityQuantityDuration (h)Total Workload
Course Duration (Including Exam Week)14342
Out of Class Study Period14570
Midterm111
Quiz000
Assignment17474
Practice000
Final000

Course Schedule

WeekSubjectPreparation
1Meeting with students; Explanation of the curriculum and principles of the course; Confidentiality agreement and related information; Awareness trainingIt does not.
2Awareness training (continued); Pre-warning about midterm exam.Awareness training.
3Awareness training (continued); Inventors; TÜBİTAK [(Secondary School Research Projects - THIS IS MY TEAM); (High School Students Research Projects); (Undergraduate 2209 / A, 2209 / B and 2241 Projects); (Graduate Projects)].Awareness training
4Explanation of the methods of benefiting from LIBRARY [especially (e-library) and TECHNOLOGY TRANSFER OFFICE (TTO)] at the University.LIBRARY at the University, especially (e-library) and TECHNOLOGY TRANSFER OFFICE (TTO)
5Literature screening, clarification and awareness training (continued)Preparation for literature review.
6Republic DayRepublic Day
7Pre-study for midterm examGeneral review before the midterm exam
8MidtermMidterm
9PATENTS; KOSGEB.PATENTS; KOSGEB.
10R & D CENTERS, DEVELOPMENT AGENCIES.R & D CENTERS, DEVELOPMENT AGENCIES.
11TECHNOPARKS.TECHNOPARKS.
12TUBITAK TEYDEB / KAMAG; EUROPEAN UNION PROJECTSTUBITAK TEYDEB / KAMAG; EUROPEAN UNION PROJECTS
13Preliminary control of projects.Preliminary control of projects.
14Receipt of projects.Receipt of projects.
15Submission of projects.Submission of projects.
16Submission of projects.Submission of projects.